Team Losi MS20DSL Servo with Saver & Long Lead: Mini-DT

SKU: LOSB0813

$39.00
Only 3 Left!



Fixed Rate By Invoice Total - $12.99
Excluding Dangerous Goods, Large Aircraft Kits/Parts, Large Car Kits/Bodies - Additional Charges May Apply (Once order is placed we will contact you if there are any additional charges)

Free pick-up from Liverpool store - $0.00
Pick up from: 339 Macquarie Street Liverpool NSW 2170 (02) 960 22 333. Confirmation from store required before picking up order. Goods CANNOT be picked up without store confirmation. Valid photo ID must be presented and verified, along with confirmation email, when picking up order. For all online order inquiries please call (02) 960 22 333. Thanks.
MS20DSL Servo with Saver & Long Lead: Mini-DT

(LOSB0813)

SKU LOSB0813
Brand LOSI
Shipping Weight 0.3000kg

Be The First To Review This Product!

Help other RC Hobbies Aust Pty Ltd users shop smarter by writing reviews for products you have purchased.

Write a product review


More From This Category


DC1 exterior fender and side mirror set

DC1 exterior fender and side mirror set

SKU: HB-230051

$19.35

10% OFF RRP $21.50
Team Losi High-Perf Skid Plate, Hard-Anodized: LST/2,AFT,MGB

Team Losi High-Perf Skid Plate, Hard-Anodized: LST

SKU: LOSB2271

$39.00

Tornado RC Differential Pinion Gear

Tornado RC Differential Pinion Gear

SKU: TRC-31039

$8.82

10% OFF RRP $9.80
Steering Hubs Edge/Seige

Steering Hubs Edge/Seige

SKU: FTX-6614

$12.69

10% OFF RRP $14.10
HSP Centre Driven Joint Cup

HSP Centre Driven Joint Cup

SKU: HSP-60011P

$13.00

HPI Axle Boot 25x47mm (4pcs)

HPI Axle Boot 25x47mm (4pcs)

SKU: HPI-104968

$17.00

15% OFF RRP $20.00
Axial Hardware Parts Tree

Axial Hardware Parts Tree

SKU: AX80018

$15.00

HPI Front Shock Tower (7075/4mm/Black/Trophy Buggy)

HPI Front Shock Tower (7075/4mm/Black/Trophy Buggy

SKU: HPI-101794

$62.00

RC8 Gold Shock Shaft Rear 38mm

RC8 Gold Shock Shaft Rear 38mm

SKU: ASS89054

$16.02

10% OFF RRP $17.80
S15 - RC8B3.1 body

S15 - RC8B3.1 body

SKU: JC0393

$53.01

10% OFF RRP $58.90
Heavy Duty Ballstud 4mm TiN

Heavy Duty Ballstud 4mm TiN

SKU: ASS91452

$14.13

10% OFF RRP $15.70
Baja 5B Front & Rear Knobby Wheel Set (4)

Baja 5B Front & Rear Knobby Wheel Set (4)

SKU: KSRC85080

$150.48

10% OFF RRP $167.20
GV CB363 BV1 FLY WHEEL

GV CB363 BV1 FLY WHEEL

SKU: CB363

$9.90

10% OFF RRP $11.00
LED Lights

LED Lights

SKU: TM562033

$15.21

10% OFF RRP $16.90
#### Inner Hinge Pins

#### Inner Hinge Pins

SKU: ASS89040

$14.04

10% OFF RRP $15.60
Metal Diff & Idler Gears Edge

Metal Diff & Idler Gears Edge

SKU: FTX-6715

$65.52

10% OFF RRP $72.80